Shed Foundation Calculator

Enter your shed's width and length to see how big to make the gravel pad and how much stone to order, or switch to a concrete slab or blocks.

Units
ft in
ft in
in

A foot on every side lets rain dripping off the roof land on stone, not soil.

in
%
$/yd³

Optional. In US units it starts at the middle of what yards across the US published for crushed stone in November 2026, for pickup. Type in your supplier’s price.

What to buy

  • 2.3 cubic yards3/4 in crushed stone, in bulk
Pad width
12 ft
Pad length
14 ft
Pad area, for the landscape fabric
168 sq ft
Stone, with the compaction allowance
2.28 yd³ (61.6 ft³)
Weight of the stone
3.08 tons (6,160 lb)
Estimated stone cost, before delivery
$112.70
  • Order 3/4 in crushed stone, which locks together when you tamp it. Pea gravel stays loose under a shed.
  • Suppliers sell by the cubic yard or by the ton, so ask which, and what delivery costs.

How the gravel pad is worked out

The pad is bigger than the shed so that rain running off the roof lands on stone. A foot on every side is the usual allowance, and it is what our shed plans use.

Pad width = shed width + 2 × border
Pad length = shed length + 2 × border
Volume (ft³) = pad width × pad length × (depth in inches ÷ 12)
Stone to order = volume × (1 + extra %), in cubic yards (÷ 27)
Weight = about 100 lb per ft³ of crushed stone, or 1.35 tons per cubic yard

Worked example: a 10 × 12 ft shed

  1. Pad size: 10 + 2 = 12 ft wide and 12 + 2 = 14 ft long.
  2. Volume at 4 in deep: 12 × 14 × (4 ÷ 12) = 56 ft³.
  3. With 10% extra for compaction: 61.6 ft³, which is 2.28 yd³.
  4. Rounded up to what you can order: 2.3 cubic yards, weighing about 3.08 tons.
  5. At $49 a cubic yard, that is $112.70 before delivery.

Gravel for common shed sizes

A 4 in pad of 3/4 in crushed stone, a foot past the shed on every side, with 10% extra for compaction. The cost is at $49 a cubic yard, the middle of what 200 yards across the US published for crushed stone in the GoodGravel Gravel Price Index for November 2026. Delivery is extra.

ShedPad sizeStone to orderWeightStone cost
6x8 8 x 10 ft 1.1 cubic yards 1.47 tons $53.90
8x8 10 x 10 ft 1.4 cubic yards 1.83 tons $68.60
8x10 10 x 12 ft 1.7 cubic yards 2.2 tons $83.30
8x12 10 x 14 ft 2 cubic yards 2.57 tons $98.00
10x10 12 x 12 ft 2 cubic yards 2.64 tons $98.00
10x12 12 x 14 ft 2.3 cubic yards 3.08 tons $112.70
10x16 12 x 18 ft 3 cubic yards 3.96 tons $147.00
12x12 14 x 14 ft 2.7 cubic yards 3.59 tons $132.30
12x16 14 x 18 ft 3.5 cubic yards 4.62 tons $171.50
12x20 14 x 22 ft 4.2 cubic yards 5.65 tons $205.80
12x24 14 x 26 ft 5 cubic yards 6.67 tons $245.00

Stone this heavy is a bulk delivery, not a bag job: the pad for a 10x12 shed would take over 120 bags of 50 lb. Ask the supplier whether they sell by the yard or the ton and what the minimum load is.

Gravel pad, slab or blocks?

The shed foundation guide compares each one, and the gravel pad guide shows how to build the pad step by step and what it costs.

Concrete for a shed slab

Choose “Concrete slab” to get the concrete for a slab the size of the shed. A 10x12 slab 4 in thick takes 1.63 yd³ with 10% for waste, which is 74 bags of 80 lb mix. At that amount a ready-mix delivery is usually less work and often less money. The concrete calculator compares the two prices.

Blocks under the skids

A shed floor sits on pressure-treated skids running its length: one under each edge, and more in between so that none are over 5 ft apart. Blocks go under each skid about every 4 ft. A 10x12 shed has 3 skids with 4 blocks under each, 12 in all, and a 12x16 takes 20. That is one block per point on level ground. On a slope the low side needs stacks, so count those as you set them out.

Quick answers

How much gravel do I need for a 10x12 shed?

Order 2.3 cubic yards of 3/4 in crushed stone, about 3.08 tons. That makes a pad 12 x 14 ft, 4 in deep, with 10% extra for compaction.

How much gravel do I need for a 12x16 shed?

Order 3.5 cubic yards, about 4.62 tons, for a pad 14 x 18 ft and 4 in deep.

How deep should a gravel pad for a shed be?

4 in of compacted crushed stone is the usual depth for a storage shed. On soft or wet ground, 6 in makes a firmer base. For a 10x12 shed that means 3.5 cubic yards instead of 2.3 cubic yards.

How much bigger than the shed should the pad be?

A foot on every side, so the pad is 2 ft wider and 2 ft longer than the shed. The roof overhangs the walls, and this keeps the drip line on stone instead of splashing soil onto the siding.

What kind of gravel goes under a shed?

3/4 in crushed stone. Its angular pieces lock together when tamped. Pea gravel is round and keeps shifting, so it makes a poor base.

Does a shed need footings?

Most storage sheds sit on a gravel pad or on blocks, with no footings in the ground. Footings below the frost line are for sheds built on posts, for steep slopes, and for towns that require them, which is more common with larger buildings. Ask your building department before you choose. See do you need a permit for a shed? and the shed footings guide, which counts and prices piers for every size.

Related calculators

Building a shed?

Plans with a free shopping list for every board, sheet and box of nails.